Matte-black 40-yard roll-off dumpster staged on a framed-out residential construction site in Chelsea, framing lumber stacked nearby, hooklift delivery truck visible in the background under bright Colorado daylight

Construction dumpster rental in Chelsea

What roll-off size is right for your Chelsea jobsite: a 30-yard container or smaller? We set it with driveway boards so nothing moves—swap-outs keep crews rolling.

Jobsite Roll-off Containers for General Contractors

Our construction fleet runs 20-, 30-, and 40-yard roll-off bins across Chelsea and Suffolk County. These containers feature reinforced steel sidewalls, walk-in rear swing doors, and steel bottom rollers for framers, roofers, and demo crews to load heavy debris. We set every container on Driveway Boards to protect your site; call us for contractor pricing and tonnage rates on multi-phase hauling projects.

Matte-black 20-yard roll-off construction dumpster with heavy ribbed steel sidewalls and swing rear doors at a working jobsite in Chelsea, sitting directly on compacted dirt with an unmarked white hauler partially visible at the far edge of the frame.

20-yard construction roll-off

A 20-Yard Construction Roll-Off fits 20 ft long by 7 ft wide and holds about 2 tons at flat rate.

This 20-yard roll-off fits kitchen and bath remodels, single-room demo, and small framing jobs in tight spaces.

Matte-black 30-yard roll-off construction dumpster sitting directly on the compacted-dirt site of a framed single-family home build in Chelsea, drywall and lumber scrap loaded inside.

30-yard construction roll-off

The 30-yard roll-off runs 22 feet long, 8 feet wide, and 6 feet tall, with about 4 tons included for your debris.

The 30-yard container handles whole-house remodels, additions, and new-build framing while its high walls fit stacks of drywall and lumber.

Matte-black 40-yard roll-off construction dumpster being lowered from a white-cab hooklift delivery truck onto the compacted-dirt jobsite at a commercial build site in Chelsea

40-yard construction roll-off

The 40-yard roll-off stretches 22 feet long, 8 feet wide, and 8 feet tall, with about 5 tons of debris included.

Sized for commercial builds and large tear-outs, the 40-yard container is the largest roll-off for multi-phase jobs in Chelsea.

Construction Debris, Drywall, Lumber Acceptance

Our construction roll-off containers accept the full range of mixed C&D debris: framing lumber, drywall, plaster, subfloor, insulation, packaging, pallets, and light metals. These loads are sorted at the Chelsea transfer station to maximize recovery — contractors usually prefer commercial recurring hauling agreements for these jobs. Please consult the EPA construction debris recycling guidance regarding material-stream handling for large projects.

  • Framing lumber and offcuts
  • Drywall, plaster, lath
  • Subfloor and sheathing
  • Insulation and vapor barrier
  • Mixed packaging and pallets
  • Light metals and conduit
Worker in a yellow high-visibility vest tossing framing lumber and broken drywall into a matte-black 30-yard construction roll-off dumpster on an active build site in Chelsea, bright daylight
Low-profile matte-black lowboy roll-off dumpster loaded with broken concrete slab and rebar at a foundation tear-out in Chelsea, skid steer parked beside it, sunny Colorado morning

Concrete, Brick, and Asphalt Heavy-debris Pricing

Dense materials need the right container. Our reinforced-steel lowboy roll-offs handle concrete slab tear-out, brick demo, asphalt millings, and clean dirt loads up to 10,000 pounds without a second trip. The low 2-to-3-foot walls let skid steers and wheelbarrows roll debris over the rim safely while staying within USDOT truck weight limits on Chelsea routes.

Heavy-debris jobs run on weight tickets from the scale house. Clean loads earn the lowest per-ton rate, while mixed debris is billed by the tonnage that comes off the scale. I coordinate each dumpster container size once I talk to the site super. Call (617) 764-9733 for reliable service.

Tonnage Limits and Weight Overage Policy

Each construction Roll-Off ships with a specific tonnage allowance included in your upfront quote. Additional weight is billed at our published per-ton overage rate against the scale-house ticket; our team verifies what the truck weighs in at the scale house—that is the final count. We track this for every container: roofing tear-off jobsite containers are priced differently because shingle weight eats through your standard debris allowance.

20-yard

3 tons

Included tonnage. Mixed C&D debris.

30-yard

4 tons

Included tonnage. Mixed C&D debris.

40-yard

5 tons

Included tonnage. Mixed C&D debris.

On-site Swap-out and Dispatch Coordination

Multi-week jobs run on a swap-out rhythm, not single drops; text or call dispatch when your container is full — we roll a fresh one to the same staging pad the same or next business day across the Chelsea metro and Suffolk County.

Step 1

Text dispatch when full

Site supers text the dispatcher a photo and the container number—no portal logins, no ticketing.

Step 2

Same- or next-day swap

We haul the full container to your pad and drop an empty one right there so the crew keeps working without losing a loading hour.

Step 3

Weekend dispatch available

Saturday pulls keep Monday starts clean; coordinate Friday afternoon for an efficient pickup.

Insurance and Contractor Account Setup

We issue certificates of insurance to the GC or the owner and that means net-30 contractor accounts with consolidated monthly billing; so the hooklift fleet stages recurring bins on active sites in Chelsea — and accounts start with a single call to dispatch.